Open stable

Reinforcement of floodplains to create an open stable area.

Properties

  • Year of implementation: 2016
  • Nature of surface: alluvial area
  • Area: 12.000 m²

Project description

For this project, an active stable with trails and paddocks covering an area of 12,000 m2 was reinforced using ECORASTER TE50 elements. The problem with this project was that the equestrian center had been built on the floodplains of a river. Now, the constant mud and sludge have been banished. The pathways and areas were leveled out with gravel and covered with ECORASTER elements. The installed elements were subsequently filled with more gravel and partly covered with sand.

Now, the horses on the equestrian property can enjoy state-of-the art grazing facilities with no mud or sludge in sight. 

Products used for this project